Construction of composite Girder Major Bridge (Well foundation) for Shakkar river
at Ch. 6770 and construction of other 10 pre- tensioned/ post tensioned single/ double
span bridges (6.1 M, 9.15 M, 12.2 M) between ch. 0/178 to ch. 5/980
Construction of Road Over Bridge (ROB) for BG Railway Siding at CSTPS Chandrapur Rail Infrastructure Facilities at Chandrapur Distt. (MS) for the proposed 2x500 MW expansion Project
CONNECTING INDIA
Redefining Infrastructure Since 1969
Contact Us
S-2, “THE METROPOLE”, Adjacent to Inox, Bund Garden Road. Pune - 411001.Maharashtra.