83,858080

Kms Track Laid

818580,808080,808080

m³ Of Earth Work Completed

828580,808080

m³ Concrete Poured

Composite Girder and Major Bridge at Gadarwara

Location - Madhya Pradesh
Construction of composite Girder Major Bridge (Well foundation) for Shakkar river at Ch. 6770 and construction of other 10 pre- tensioned/ post tensioned single/ double span bridges (6.1 M, 9.15 M, 12.2 M) between ch. 0/178 to ch. 5/980 for Gadarwara Railway siding.

RITES Limited

Location - Madhya Pradesh

Status - Completed

Earthwork, Track linking & ROB at NTPC Khargone (In-Plant Yard)

Location - Madhya Pradesh
Construction of Earthwork, ROB along with approaches, supply of ballast, p-way materials, p-way linking and allied works for private railway siding works at in plant yard of NTPC Khargone STPP

RITES Limited

Location - Madhya Pradesh

Status - Completed

Railway Siding Work at Raigarh

Location - Madhya Pradesh
BG. Railway siding work comprising a new mid-section crossing station located between SECR’s Robartson and Bhupdeopur station together with siding facilities for the proposed SKS Power Generation Co. Ltd. (SPGCL) 4x300MW coal SKS Power Generation (Chhattisgarh) Ltd

Location - Chhattisgarh

Status - Completed

Balance work of Site Leveling & Infrastructure Works near Hotgi Railway Station

Location - Maharashtra
Balance work of Site Leveling & Infrastructure Works Package for Solapur Super Thermal Power Project (2x 660 MW)

NTPC

Location - Maharashtra

Status - Completed

Private Railway Siding at NTPC Limited near Hotgi Railway Station

Location - Maharashtra
Construction of Private Railway Siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for SSTPP of NTPC Limited near Hotgi Railway Station – Civil works from Ch. 2.400 to Ch. 6.000 & P.Way works in entire siding system – Pkg. 2

IRCON INTERNATIONAL LIMITED

Location - Maharashtra

Status - Completed

Railway Track for Plant Internal Yard (Pkg.095B) for SAIL, Bhilai

Location - Chhattisgarh
Railway Track for Plant Internal Yard (Pkg.095B) at BSP Bhilai

SAIL

Location - Chhattisgarh

Status - Completed

Road Over Bridge at Chandrapur

Location - Maharashtra
Construction of Road Over Bridge (ROB) for BG Railway Siding at CSTPS Chandrapur Rail Infrastructure Facilities at Chandrapur Distt. (MS) for the proposed 2x500 MW expansion Project.

Maharashtra State Power Generation Co. Limited.

Location - Maharashtra

Status - Completed

Private Railway Siding at Inplant Yard NTPC- Mouda (Stage-II)

Location - Maharashtra
Construction of Earthwork, RCC Bridges (Cast-insitu and Cut & Cover), FOB, Loco Shed, Supply of Ballast, P-way Materials and P-way linking work for private railway siding (Stage-II) works at Inplant yard of NTPC- Mouda

RITES Ltd.

Location - Maharashtra

Status - Completed

Track work and Supply of P-Way material at Ahmedgarh, near Ludhiana.

Location - Punjab
Supply of P. Way material and Linking of Railway Track siding and its connectivity from Ahmedgarh station to inside MMLH Ahmedgarh, near Ludhiana.

Container Corporation of India Ltd

Location - Punjab

Status - Completed

Track work at NTPC Kudgi

Location - Karnataka
LINKING OF TRACK AND COMMISSIONING OF RAILWAY SIDING INCLUDING SUPPLYING OF PSC SLEEPERS, TRACK FITTINGS, TURNOUTS, BALLAST BETWEEN CH 2/850 TO CH 10/200 FOR KUDGI STPP,NTPC LTD. AT KUDGI, DIST BIJAPUR, KARNATAKA

Konkan Railway Corporation Ltd

Location - Karnataka

Status - Completed

Railway Siding Earthwork at Tilati station in Solapur Division

Location - Maharashtra
Execution of Railway Siding works consisting of Earthwork in embankment and cutting, Supply and spreading of Ballast, Supply of P-Way materials, Laying and linking of Railway Track, construction of bridges, works for entire siding in both In-plant yard and Station yard for CCCL- Solapur proposed siding take off from New Tilati station in Solapur Division of Central Railway

Chettinad Cement

Location - Maharashtra

Status - Completed

Earthwork and Track Linking at Khargone (Package II)

Location - Madhya Pradesh
Earthwork in Railway formation including filling, cutting, blanketing and construction of bridges, P way track linking works including supply of Railway track ballast and P way materials, fittings and fixtures (including supply of Rails) etc. in connection with construction of Railway infrastructure to serve Khargone STPP (2X660) MW (Package II)

RITES Limited

Location - Madhya Pradesh

Status - Completed

Churu Gauge Conversion Project at Jaipur-Sikar-Loharu & Sikar

Location - Rajasthan
Dismantling of existing MG track, Laying and linking of Broad gauge main line, loop lines/Sidings including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials and other ancillary works in Zone-I (Km. 0.0 to Km. 48.70) including Sikar, Laxmangarh Sikar & Fatehpur Shekhawati yards in Sikar - Churu section in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project

NWR Railway

Location - Rajasthan

Status - Completed

Gauge Conversion Project between Latur and Osmanabad Section

Location - Maharashtra
Laying & Linking of B.G. Track in Latur - Osmanabad section & making the same as LWR track including insertion of Glued Joints, SEJ, Providing Check/ guard Rails wherever required, assembling of Turnout on formation providing and fixing curve/ LWR board, etc. as directed and as per IRPWM with latest correction slip in connection with Miraj - Latur Gauge Conversion Project.

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Railway siding work at Sanjay Gandhi Thermal Power Station, Birsinghpur - Umaria

Location - Madhya Pradesh
Laying & Linking of P. way including supply of P. way Materials, turnouts, supply and spreading of stone ballast, supply of PSC sleeper etc. complete in connection with proposed Railway siding at SGTPS at Birsinghpur Dist. Umaria for M/s. MPPGCL

RITES, Nagpur / Madhya Pradesh Power Generation Co. Ltd. (MPPGCL)

Location - Madhya Pradesh

Status - Completed

Earthwork in Cutting & Embankment (Filling) at NTPC In-plant yard - Kudgi (Package I)

Location - Karnataka
Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 3/800 – 5/400 (Filling beyond Chainage 5/400 and upto Chainage 7/800 also) Package – I at NTPC In-plant yard for construction of new Railway siding for NTPC Limited between Gadag – Hotgi section of South Western Railway at Kudgi.

Konkan Railway Corporation Limited

Location - Karnataka

Status - Completed

Railway Siding Track work at Bokaro

Location - Jharkhand
Construction of Broad Gauges Railway Siding Project at New POL Depot Bokaro

HPCL Mumbai

Location - Jharkhand

Status - Completed

CTR at Guru Gobindsingh Power Plant at Ropar

Location - Punjab
CTR at Guru Gobindsingh Super Thermal Power Plant at Ropar, Punjab.

Punjab State Power Corporation

Location - Punjab

Status - Completed

Broad Gauge Railway Siding work at HPCL-Kadapa.

Location - Andhra Pradesh
Construction of Broad Gauge Railway Siding Including Lead Line & R&D Yard and Unloading Line at KADAPA for HPCL

Hindustan Petrolium Corporation Ltd., (HPCL) – Kadapa

Location - Andhra Pradesh

Status - Completed

BTPS Expansion Project at Deepnagar

Location - Maharashtra
BTPS Expansion Project 2x500 MW unit – Construction of B.G Railway siding for Bhusawal TPS Expansion Project 2x500 MW Deepnagar, BHUSAWAL.

Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai.

Location - Maharashtra

Status - Completed

Complete Rail system Renovation at Nasik TPS, Eklahare.

Location - Maharashtra
Nasik TPS – Work of Complete Rail system Renovation of Nasik Thermal Power Station including earthwork, all civil works and incidental works etc at Nasik TPS. Eklahare, Nasik.

Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai.

Location - Maharashtra

Status - Completed

Gauge Conversion Project between Osmanabad and Kurudwadi Section

Location - Maharashtra
Laying & Linking of B.G. Track in Osmanabad – Kurudwadi section in connection with Miraj - Latur Gauge Conversion Project

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Khaparkheda TPS (Expansion Project)

Location - Maharashtra
Khaparkheda TPS (Expansion Project) – Renovation of BG Railway Siding, including Minor earthwork, Misc civil works and all incidentals works etc in Exchange Yard and Implant Yard at Khaparkheda TPS Dist. Nagpur.

Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai.

Location - Maharashtra

Status - Completed

Supply of PSC Sleepers at Anpara, Sonebhadra

Location - Uttar Pradesh
Supply and Stacking of PSC Sleepers for Ampara ”D” Thermal power project (2x500MW) at Anpara Dist. Sonebhadra UP

UP Rajya Vidyut Utpadan Nigam Ltd. / RITES, Lucknow.

Location - Uttar Pradesh

Status - Completed

Strengthening and Construction of Rail System at Korba (West)

Location - Chhattisgarh
Strengthening and Construction of Rail system for heavy consignment like stator movement from Gevra road to CSPGCL 1x500 MW TPP, Korba (West)

RITES Limited

Location - Chhattisgarh

Status - Completed

Conversion MG to BG Project between Purna – Akola Stations

Location - Maharashtra
Conversion of Purna-Akola section from MG to BG miscellaneous works including dismantling of existing MG track between Purna – Akola Stations Reach – I, II, V, IX, XII, XIII, XIV, XV, XIX, XX

South Central Railway, Secunderabad.

Location - Maharashtra

Status - Completed

Gauge Conversion BOT Project between Mehasana -Viramgam Section.

Location - Gujarat
Gauge Conversion between  Ch 000m to 24000m of Mehasana -Viramgam Section including earth works, bridge works & gate approaches excluding track fittings of Western Railway on BOT basis track linking contract.

Western Railway / Viramgam Mehesana BOT Project.

Location - Gujarat

Status - Completed

Narkher - Amravati New BG Line Project

Location - Maharashtra
Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line.

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Laying & Linking of Track at Majri Khadan

Location - Maharashtra
Laying & Linking of track, assembling& insertion of Turnouts, dismantling of track/ turnouts, welding of Rail joints, running out of ballast etc & Supply of P. way Fittings at Majri, Majri Khadan, Wani  & Pimpalkhuti in connection with running of passenger Train services.

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Talvadiya-Khirkiya Mainline Diversion Project. (Ch. 000 m to Ch. 30000 m) 

Location - Maharashtra
Linking of Double Line Track, including supply of minor track fitting and other misc. works between Ch. 000m to Ch. 30000 m of Talvadiya-Khirkiya Mainline Diversion Project.  

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Puntamba – Shirdi New BG Rail line project.

Location - Maharashtra
Laying & Linking of track between Ch. 000 to Ch. 18000(Entire Length) in connection with Puntamba – Shirdi New BG Rail line project.

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

CTR (P) of track by PQRS method at IGP Bhusawal.

Location - Maharashtra
CTR (P) of track by PQRS method bet. Kms.287 to 295&297.2 to326 = 36.80 Tkms(without deep screening)25.00 Tkms by PQRS and 11.80 by manual method on Dn Rd of IGP- BSL sec. CTR (S) of CSN-DHI Sec. Betn Kms. 359.5to 369.5 = 10.00 of IGP-BSL Section

Central Railway, Mumbai.

Location - Maharashtra

Status - Completed

Surendranagar Pipavav BG Rail Link Project.

Location - Gujarat
Linking of BG Main line, Points and Crossings at various yards, spreading of ballast, P.way materials and other incidental works between stations Surendranagar (Incl) KM 0.00 and Chuda (Excl) KM 38.80 in connection with Surendranagar Pipavav BG Rail Link Project.

Western Railway, Mumbai..

Location - Gujarat

Status - Completed

Khamgaon to Deulgaon Road Project

Location - Maharashtra
Upgradation of Khamgaon to Deulgaon Sakarsha Section (Length of 35.786 Km) of NH-548C from Existing Ch. 565+653 to Ch. 529+867 (Design Ch. 0+000 to Ch. 35+786) in the State of Maharashtra to 2 Lane with Paved Shoulder (Package-I). (Approximately 35.786 km)

NHAI

Location - Maharashtra

Status - ongoing

Earthwork and Construction of Minor Bridges at NTPC railway siding in Raigarh

Location - Chattisgarh
Execution of earthwork in formation, Construction of Minor Bridges, Blanketing, P-way Linking works including supply of P-Way fitting, track ballast, PSC sleeper and points and crossing in connection with construction of railway infrastructure from 3/771 KM to 12/000 Km LP, Lines of ROR section from Ch. 0/000 KM to 1/000 Km ROR of NTPC railway Siding in Raigarh district, Chattisgarh state (Package II C)

RITES Limited

Location - Chattisgarh

Status - ongoing

Mangrulpir to Mahan Road Project

Location - Maharashtra
Rehabilitation and Upgradation of 2 lane road with paved shoulders of Mangrulpir to Mahan (NH 161 A from 97/074 to 64/574 ) [Design km. 75/000 to km. 107/500] (Total Length = 32.5 Km) in the state of Maharashtra on EPC Basis mode.

NHAI

Location - Maharashtra

Status - ongoing

Steel Composte Girder ROB between Lohardaga and Tori

Location - Jharkhand
Construction of Steel composite Girder Road Over Bridge No. 75C of Span 1 X 24 M at Chandwa Town (Ch 40.305 km) over Chandwa Mckluesganj Road (SH-142) between Lohardaga (0.00 km) and Tori and other allied work of S.E.Railway

South Eastern Railway

Location - Jharkhand

Status - ongoing

Earthwork and Extension of Bridges at Pune-Miraj (Section I)

Location - Maharashtra
Earthwork in embankment and cutting including extension of Minor Bridges and RUBs in connection with Pune-Miraj doubling from km 0.00 (Pune) to km 65 (excluding Daunduj)

Central Railway

Location - Maharashtra

Status - ongoing

Track and Station Building Works at Ratnagiri Main Line

Location - Maharashtra
Construction of 8 nos. of Crossing stations and 7 nos. of additional loop lines at Existing stations of Konkan Railway.

Konkan Railway Corporation Limited

Location - Maharashtra

Status - ongoing

Track Work at Pune-Miraj (Section I)

Location - Maharashtra
Track work in Section I (Km 0.00 to Km 65.00) in connection with Pune Miraj Doubling Project

Central Railway

Location - Maharashtra

Status - ongoing

Track Work at Pune-Miraj (Section II)

Location - Maharashtra
Track work in Section II (Km 65.00 to Km 145.00) in connection with Pune Miraj Doubling Project

Location - Maharashtra

Status - ongoing

Railway Siding and Building Works at Jobner

Location - Rajasthan
Construction of Railway Siding (P-Way) and Building works at Jobner

Bharat Petroleum Corporation Limited

Location - Rajasthan

Status - ongoing

Broad Guage Linking of Railway Track in Bangladesh

Location - Bangladesh
Linking of Broad Gauge LWR/SWR Railway Track with 60Kg Rail Section including Supply of Fittings and fastening system as per approved design/drawing/specification for construction of Khulna/Mongla Port Rail Line Project.

Ircon International Ltd.

Country - Bangladesh

Status - ongoing

P-Way Maintenance, S&T Maintenance

Location - Madhya Pradesh
AMC Services for P-Way Maintenance and S&T maintenance

Nabha Power Limited

Location - Madhya Pradesh

Status - ongoing

Track Work at Pune-Miraj (Section III)

Location - Maharashtra
Track work in Section III (Km 145 to 216) in connection with Pune Miraj Doubling work

Central Railway

Location - Maharashtra

Status - ongoing

ROB and RUB works at Savda Railway Station

Location - Maharashtra
Construction of ROB and RUB, Limited Height Subway in lieu of existing railway crossing No. 162 at Kms 459/9-11 near Savda Railway Station

Central Railway

Location - Maharashtra

Status - ongoing

Bridges and Earthwork between Chalisgaon-Jalgaon section

Location - Maharashtra
Construction of 165 nos. Minor Bridges in Earthwork and Embankment and Cutting between Chalisgaon Jalgaon section.

Central Railway

Location - Maharashtra

Status - ongoing

Stone Crushed Ballast Supply at Bhusawal Division

Location - Maharashtra
Supply and Stacking of 65 mm Gauge Machine Crushed Stone Ballast and loading into Hoppers/Boby and wagons by mechanical means.

Central Railway

Location - Maharashtra

Status - ongoing

Private Railway Siding work in Darlipali- Dulanga MGR section Package-2

Location - Odisha
Construction of private railway siding with all Contractor’s materials (except Rails for plain track issued free of cost) for coal transportation system for Darlipali STPP of NTPC Limited in Sundergarh Distt in Odisha state–For Inside Plant to Ch. 4062 – Pkg. 2 in Darlipali- Dulanga MGR section

Ircon International Ltd.

Location - Odisha

Status - ongoing

Track and all related works for Sambalpur-Titlagarh Project

Location - Odisha
Construction of Track Linking (excluding supply of rails and sleepers, thick web switches), supply of ballast, S&T, OHE/RE and General Electric works in between Badmal-Titlagarh Section (20 Kms) in connection with Sambalpur-Titlagarh Doubling Project.

Rail Vikas Nigam Limited

Location - Odisha

Status - ongoing

Proposed elimination of Level Crossing

Location - Maharashtra
Proposed elimination of Level crossing by providing subway by box pushing method in lieu of LC No. LC 158 at Kms 452/22-24, LC No 165 at Km 464/10 -12, LC No. 166 at Km 466/02-04, LC No. 170 at Km 472/22-24, LC No. 174A at Km 496/10-12, LC No. 174 at Km 492/22-24, LC No. 172 at Km481/22-24 and LC No. 164 at Km 462/00-02.

Central Railway

Location - Maharashtra

Status - ongoing

Weld Renewal by FBW at Kurduwadi

Location - Maharashtra
Through weld renewal by mobile flash butt welding plant between Km.343.40-345.30=1.90 Km, 345.60-349.20=3.60 Km, 349.50-350.80=1.30 Km, 351.10-383.20=32.10 Km, 397.10-400.20=3.10 km, 400.50-420.80=20.30 Km and 383.50-396.70=13.20 Km, total 75.50 Km.

Central Railway

Location - Maharashtra

Status - ongoing

Roadbed, Bridges, Supply of Ballast, Installation of Track Package-2 in Bhavnagar Division

Location - Gujarat
Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC sleepers), Electrical (Railway Electrification and General Electrification), outdoor signalling and telecommunication works for Gauge conversion of track between Lunidhar (excluding) and Jetalsar (including) from Km. 49.50 to Km. 104.50. Package-2 in Bhavnagar Division of Western Railway

RVNL

Location - Gujarat

Status - ongoing

Doubling of Track between Palanpur and Bhildi in Ahmedabad Division

Location - Gujarat
Doubling of track between Palanpur and Bhildi (43.68 Kms.) – Construction of Roadbed, bridges, supply of ballast, Installation of track (excluding supply of rails & PSC line sleepers), Electrical (General Electrification), Signaling and Telecommunication works. Package 5 in Ahmedabad Division of Western Railway

RVNL

Location - Gujarat

Status - ongoing

Weld Renewal by FBW at Ahmedabad

Location - Gujarat
Conversion of SWR/Free rails into LWR by using flash butt welds with mobile flash butt Plant

Western Railway

Location - Gujarat

Status - ongoing

Itarsi-Nagpur third line project

Location - Maharashtra
Construction of Minor Bridges (RCC Box), Earthwork in formation side drains and Toe/ retaining wall between Km. 912 to Km 930.4 between Chichonda section (including) and Teegaon Station (Including) for Teegaon-Chichonda 3rd Line of Itarsi-Nagpur Section.

Central Railway

Location - Maharashtra

Status - ongoing

Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (I)

Location - Maharashtra
Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer – in – charge between Km 50.250 to 100.252 in Kada – Amalner section in connection with Ahmednagar – Beed – Parli Vaijnath New Broad Gauge Line Project

Central Railway

Location - Maharashtra

Status - ongoing

Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (II)

Location - Maharashtra
Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 120.00 to 142.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project".

Central Railway

Location - Maharashtra

Status - ongoing

Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (III)

Location - Maharashtra
Supply of Machine Crushed Stone Ballast of size 65 mm as per RDSO specification for Track ballast IRS GE-1 June 2004 & stacking same along cess / within available space on Railway Land or on the embankment as directed by Engineer - in - charge between Km 142.00 to 160.00 in Amalner-Raimoha Section in connection with Ahmednagar - Beed - Parli Vaijnath New Broad Gauge Line Project".

Central Railway

Location - Maharashtra

Status - ongoing

Stone Crushed Ballast Supply at Ahmednagar – Beed – Parli (IV)

Location - Maharashtra
Supply of machine crushed stone ballast of size 65mm as per RDSO specification for track ballast IRS GE-1 June 2004 & stacking same along cess/ within available space on Railway Land or on the embankment as directed by Engineer-in-charge between km 210.000 to Parli (V) in Beed-Parli section in connection with Ahmednagar-Beed-Parli Vaijnath New Broad Gauge Line Project

Central Railway

Location - Maharashtra

Status - ongoing

Redefining Infrastructure Since 1969

Contact Us