Completed Projects

ISC Projects Pvt. Ltd. has successfully completed numerous Track Linking and Private Railway Siding Projects. Details of a few are given below.

Particulars of the project Name of the client Total kms Value of the project
(In Lakhs)
Construction of Private Railway siding with all Contractor’s materials For coal transportation system for SSTPP of NTPC Limited near Hotgi Railway Station in Maharashtra – Civil work from Ch. 2.400 to Ch. 6.000 & P. Way works in entire siding system – Pkg. 2


IRCON INTERNATIONAL LIMITED (A Government of India Undertaking) 31.601km 6063.66
Construction of Broad Gauges Railway siding at New POL DEPOT PROJECTS BOKARO – HPCL Mumbai HPCL Mumbai 5.6km 2493.60
For Chandrapur TPS - Expansion Project - 2x500 MW - Design, Engineering, Drawing and Construction of Road Over Bridge (ROB) for proposed B.G. Rly. Siding at Chandrapur. MAHARASHTRA STATE POWER GENERATION CO. LTD. MUMBAI 16span 2107.52
CTR at Guru Gobindsingh Super Thermal Power Plant at Ropar, Punjab
Punjab State Power Corporation 8.555km 723.8
Construction of Broad Gauge Railway Siding Including Lead Line & R&D Yard and Unloading Line at KADAPA for HPCL Hindustan Petrolium Corporation Ltd., (HPCL) – Kadapa   
  4.43km
2054.96
BTPS Expansion Project 2x500 MW unit – Construction of B.G Railway siding for Bhusawal TPS Expansion Project 2x500 MW Deepnagar, BHUSAWAL. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai. 25.706km 7318.91
Nasik TPS – Work of Complete Rail system Renovation of Nasik Thermal Power Station including earthwork, all civil works and incidental works etc at Nasik TPS. Eklahare Dist. Nasik. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai.  32.41kms
 
5481.44
Laying & Linking of B.G. Track in Latur - Osmanabad section & making the same as LWR track including insertion of Glued Joints, SEJ, Providing Check/ guard Rails wherever required, assembling of Turnout on formation providing and fixing curve/ LWR board, etc. as directed and as per IRPWM with latest correction slip in connection with Miraj - Latur Gauge Conversion Project. Central Railway, Mumbai. 79.23kms 5661.50


Laying & Linking of B.G. Track in Osmanabad – Kurudwadi section in connection with Miraj - Latur Gauge Conversion Project Central Railway, Mumbai. 74.02km 4971.00


Khaparkheda TPS (Expansion Project) – Renovation of BG Railway Siding, including Minor earthwork, Misc civil works and all incidentals works etc in Exchange Yard and Implant Yard at Khaparkheda TPS Dist. Nagpur. Maharashtra State Power Generation Co. Ltd. (MSPGCL) Mumbai. 15.941kms 1545.40


Supply and Stacking of PSC Sleepers for Ampara ”D” Thermal power project (2x500MW) at Anpara Dist. Sonebhadra UP UP Rajya Vidyut Utpadan Nigam Ltd. / RITES, Lucknow. - 1447.70


Strengthening and Construction of Rail system for heavy consignment like stator movement from Gevra road to CSPGCL 1x500 MW TPP, Korba (West) RITES /
Chattisgarh State Power Generation Co. Ltd. (CSPGCL)
  1178.70


Conversion of Purna-Akola section from MG to BG miscellaneous works including dismantling of existing MG track between Purna – Akola Stations Reach – I, II, V, IX, XII, XIII, XIV, XV, XIX, XX South Central Railway, Secunderabad. 112.00kms  796.2



Gauge Conversion between  Ch 000m to 24000m of Mehasana -Viramgam Section including earth works, bridge works & gate approaches excluding track fittings of Western Railway on BOT basis track linking contract. Western Railway / Viramgam Mehesana BOT Project.   24.50kms 596.0


Laying & Linking of P. way and supply of P. way fittings etc. between ChandurBazar and Badnera stations in Ch. 94000m to 136150m Narkher - Amravati New BG Line. Central Railway, Mumbai. 45.644kms 555.0


Laying & Linking of track, assembling& insertion of Turnouts, dismantling of track/ turnouts, welding of Rail joints, running out of ballast etc & Supply of P. way Fittings at Majri, Majri Khadan, Wani  & Pimpalkhuti in connection with running of passenger Train services. Central Railway, Mumbai. 5.08 Kms. CTR-9.36 Kms 408.0


Linking of Double Line Track, including supply of minor track fitting and other misc. works between Ch. 000m to Ch. 30000 m of Talvadiya-Khirkiya Mainline Diversion Project.   Central Railway, Mumbai. 62.278kms 394.0


Laying & Linking of track between Ch. 000 to Ch. 18000(Entire Length) in connection with Puntamba – Shirdi New BG Rail line project. Central Railway, Mumbai. 18kms  293.0

CTR (P) of track by PQRS method bet. Kms.287 to 295&297.2 to326 = 36.80 Tkms(without deep screening)25.00 Tkms by PQRS and 11.80 by manual method on Dn Rd of IGP- BSL sec. CTR (S) of CSN-DHI Sec. Betn Kms. 359.5to 369.5 = 10.00 of IGP-BSL Section Central Railway, Mumbai. 56.60Kms.
 
284.0


Linking of BG Main line, Points and Crossings at various yards, spreading of ballast, P.way materials and other incidental works between stations Surendranagar (Incl) KM 0.00 and Chuda (Excl) KM 38.80 in connection with Surendranagar Pipavav BG Rail Link Project. Western Railway, Mumbai. 38.80kms 193.0

Laying & Linking of P. way including supply of P. way Materials, turnouts, supply and spreading of stone ballast, supply of PSC sleeper etc. complete in connection with proposed Railway siding at SGTPS at Birsinghpur Dist. Umaria for M/s. MPPGCL RITES, Nagpur / Madhya Pradesh Power Generation Co. Ltd. (MPPGCL)   184.80